Freeport, Bahamas

BORCO DOCK

ESDC Engineering Project Scope included the Engineering, Design, Equipment Specification, and Project Consulting of an Inland Marine Dock. ESDC Engineering provided Engineering Services for Mechanical, Civil/Structural, Electrical, Automation/Controls and Fire Protection.

This project was for the expansion of an Inland Marine Dock Terminal Facility that included:

  • Three (3) 16” Load Arms with Vapor Piping
  • One (1) 20” Load Arm
  • Vapor System including Marine Safety Skid and Vapor Combustion Unit
  • Dock Manifold System
  • Dock and Tank Fire Protection Systems
VARIOUS TEXAS LOCATIONS

Bridgetex Pipeline Stations

ESDC Engineering Scope included the Engineering, Design, Equipment Specification, Material Management Services, Project Consulting and Project Management of five grass roots Pipeline Pump Stations. ESDC Engineering provided Engineering Services for Mechanical, Civil/Structural, Electrical and Automation/Controls. ESDC Engineering provided Project and Construction Management services from site development to commissioning.

This project was comprised of five (5) grass root Crude Oil Pipeline Pump Stations to support the new BridgeTex 12,700 bph pipeline. Each pump station included:

  • Dual 4,500 hp mainline pumps
  • Sump systems
  • Process piping
  • Instrumentation
  • Automation and Controls
  • New electrical utility services
  • VFDs
  • MCC Buildings
  • Maintenance Buildings
  • Additive Injection Systems
  • Access Roads
Perth Amboy, NJ

PERTH AMBOY FACILITY

(Truck Loading Rack / Rail Car Offload / Tank Farm Upgrade)

ESDC Engineering Project Scope included the Engineering, Design, Equipment Specification and Project Consulting of a new three bay Truck Loading Rack, Tank Farm Upgrade for a Marine Facility, and a new Rail Car Offloading Terminal. ESDC Engineering provided Engineering Services for Mechanical, Civil/Structural, Electrical Automation/Controls and Fire Protection.

This project comprised of the installations that included:

  • A new three (3) lane truck loading rack with ratio blending system
  • 300’ long Manifold system for twelve (12) product storage tanks, six (6) piping systems for the marine dock, and two (2) pipelines
  • 104 rail car loading spots with containment pans
  • Elevated walkway system for access to top of rail cars
Ozona, TX

BARNHART CRUDE OIL TERMINAL

ESDC Engineering Scope included the Engineering, Design, Equipment Specification, Material Management Services, Project Consulting and Construction Management of a pipeline receipt, truck offloading, tank storage, and pipeline injection terminal. ESDC Engineering provided Engineering Services for Mechanical, Civil/Structural, Electrical and Automation/Controls. ESDC provided Construction Management services from site development to commissioning.

This project included the installation of grass roots Crude Oil Pipeline Terminal associated with the Longhorn pipeline that included:

  • Six (6) truck offload spots
  • Pipeline receipt manifold for four (4) incoming pipelines
  • Additive injection system
  • Metering skid
  • Prover
  • Sampling system
  • Mainline pump
  • Buildings (MCC / Office-Warehouse / Lab)
  • Sump system
  • Process piping and instrumentation
  • Automation and Controls
  • New electrical utility services
  • VFD
  • Stormwater containment
  • Two (2) 80,000 bbl storage tanks
  • Tank containment
Corpus Christi, TX

CORPUS CHRISTI TANK FARM & TERMINAL

ESDC Engineering Scope included the Engineering, Design, Equipment Specification and Project Consulting for the following items:

  • Ten Thousand Two Hundred (10,200) Feet Of Underground Fire Water Main
  • Thirty-Three (33) High Volume Fire Hydrants
  • Ten (10) Semi-Fixed Foam Fire Suppression Systems for Petroleum Product Storage Tanks.
  • Deluge Water Spray Fire Suppression System For Six (6) LPG Bullet Tanks
  • Fire Water Storage Tank
  • One (1) Electric Driven Fire Pump
  • One (1) Diesel Driven Fire Pump
  • Fire Detection System For Fire Pump Building & Six (6) LPG Bullet Tanks
  • NFPA 30 Tank Spacing Layout
Perth Amboy, NJ

PERTH AMBOY TANK FARM & TERMINAL

FIRE PROTECTION

ESDC Engineering Scope included the Engineering, Design, Equipment Specification and Project Consulting for the following items:

  • Firewater Storage Tank
  • (1) 5,000 gpm Diesel Driven Fire Pump
  • Deluge Water Spray System for (3) Three LPG Tanks
  • Deluge Water Spray System for LPG Offloading
  • Fire Detection System for Fire Pump Building, (3) Three LPG Tanks, and LPG Offloading
  • (31) Thirty-One Semi-Fixed Foam Fire Suppression Systems for Petroleum Product Storage Tanks.
  • Permitting Services
Houston, TX

HOUSTON TANK FARM & TERMINAL

ESDC Engineering Scope included the Engineering, Design, Equipment Specification and Project Consulting for the following items:

  • Sixteen (16) Fixed Foam Fire Suppression Systems for Petroleum Product Storage Tanks.
  • Eight (8) Fire Hydrants
  • Four (4) Foam Riser Manifolds With Bladder Tanks
  • NFPA 30 Tank Spacing Layout
  • Permitting Services